06:18 EST FRIday, 16/11/2018

NEWS

ABOUT US

Home » News » The Headquarter

Initial Environmental Asessment (IEE) for the Changed Options of Benluc - Longthanh Expressway Project

Because Ministry of Transport decided to change the viaduct into embankment at 2 sections of the Benluc - Longthanh Expresway project the International Donor (ADB) required to conduct IEE for the changed options. 
VESDEC was selected to implement this assignment. From December2013 to February 2014 the IEE included field surveys, ecologic study, environmental analysis and IEE report preparation, was executed. In March 2014 IEE reports in English and Vietnamese were completed and cleared by ADB and VEC.
 
Environmental study for the Changed Options of the Benluc – Longthanh Expressway project, January 2014

 


Author: VESDEC

Source: -

Total notes of this article: 5 in 1 rating
Click on stars to rate this article

Newer articles

Older articles

 

CONTACT US

DIRECTOR
Name: Assoc. Prof. Dr. Le Trinh
Phone: 0982619336

HOCHIMINH CITY
Name: No.179 Bachdang St., Ward 2, Tanbinh Dist.
Phone: 028.38489284 (Ext: 4)

HANOI
Name: B19, Lot 9, Dinhcong New Urban Quarter, Hoangmai Dist.
Phone: 0982619336

DANANG CITY
Name: No.92 Thanhhai St., Haichau Dist.
Phone: 0511. 382 4547

RHINO PROTECTION

ENV

STATISTICS

OnlineOnline : 18

TodayToday : 136

This monthThis month : 2029

TotalTotal : 1302180