• Home
  • About us
    • » About us
    • » Function
    • » Objectives
    • » Duties
    • » Cooperation linkages
  • Topic & Projects
    • » Provision of environmentalist
    • » Scientific research
    • » Environmental monitoring
    • » Study and Preparation of Guidelines in Environmental Protection
    • » Strategic environment assessment
    • » Environmental Impact Assessment
  • Documents
    • » Laws
    • » Decrees
    • » Circulars
    • » Decisions
    • » Regulations
  • Training & Cooperation
    • » International cooperation
    • » Training
  • Scientific reports
    • » Science-Technology
    • » Scientific reports
    • » Scientific workshop
  • News
    • » VESDEC activities
    • » Director activities
    • » Careers at VESDEC
  • Contact
 

❄

•NEWS

  • VESDEC activities
  • Director activities
  • The Headquarter
    • International Projects
    • National Projects
  • Northern Branch
    • International Projects
    • National Projects
  • Careers at VESDEC

•ABOUT US

  • About us
  • Function
  • Objectives
  • Duties
  • Cooperation linkages

•TOP NEWS

  • Vietnam 2025: Nature, People, and Life in Diverse Regions and Identity - Volume 1 Vietnam 2025: Nature, People, and Life in Diverse Regions and Identity - Volume 1
  • Green rivers and Can Gio mangrove ecosystem: The lifeblood of Ho Chi Minh City Green rivers and Can Gio mangrove ecosystem: The lifeblood of Ho Chi Minh City
  • Three beautiful waterfalls in the North Central Highland Three beautiful waterfalls in the North Central Highland
  • Natural Beauty of Vietnam (Episode 3) - Southern Vietnam Natural Beauty of Vietnam (Episode 3) - Southern Vietnam
  • Natural Beauty of Vietnam (Episode 2) - Central and Central Highlands Natural Beauty of Vietnam (Episode 2) - Central and Central Highlands

Home » News » Northern Branch » International Projects

Environmental Supervision for the Trungson Hydropower Project in the Construction Stage

The Trungson Hydropower Project is financed by the WB, therefore, environmental management should be complied with the Vietnamese as well as the WB Safeguard Policies.

To evaluate the compliance of the Contractor with the WB guidelines AECOM – New Zealand, the international consultant in construction supervision, has signed sub-contracts with 4 VESDEC specialists, one of which is national environmental adviser, the other ones are environmental supervisers to implement environmental supervision from 2013 to 2017.
VESDEC team has conducted daily monitoring on air, noise, water pollution, soil erosion, solid waste disposal, sanitation conditions at the main construction works and at worker camps. Daily environmental supervision report is prepared. Thank to the strict environmental supervision pollution issues at the construction site are significantly improved. The environmental supervision is well evaluated by the WB. 
VESDEC environmental supervision team at the project site (left); project office buildings and the Ma river (right), August 2013

Author: VESDEC

Source: -

Total notes of this article: 10 in 2 rating
Click on stars to rate this article

Newer articles

  • Environmental supervision for Trungson Hydropower Project (08/06/2014)
  • Environmental Monitoring for the JICA’ T2 Terminal Constrcution Project at Noibai (Hanoi) International Airport (21/01/2014)
  • Participation into the Environmental Auditing for the End – Term of the WB’ RFP III (21/01/2014)
 

•MAIN OFFICE

Main Office
Name: No. 179, Bachdang Str., Tansonhoa ward, HCMC, Vietnam
Phone

•LAW ON ENV. PROTECTION

ENV

•STATISTICS

OnlineOnline : 13

TodayToday : 368

This monthThis month : 7124

TotalTotal : 2207335

View counter statistics
   Power by  © Copyright 2010.  All rights reserved Contact us