• Home
  • About us
    • » About us
    • » Function
    • » Objectives
    • » Duties
    • » Cooperation linkages
  • Topic & Projects
    • » Provision of environmentalist
    • » Scientific research
    • » Environmental monitoring
    • » Study and Preparation of Guidelines in Environmental Protection
    • » Strategic environment assessment
    • » Environmental Impact Assessment
  • Documents
    • » Laws
    • » Decrees
    • » Circulars
    • » Decisions
    • » Regulations
  • Training & Cooperation
    • » International cooperation
    • » Training
  • Scientific reports
    • » Science-Technology
    • » Scientific reports
    • » Scientific workshop
  • News
    • » VESDEC activities
    • » Director activities
    • » Careers at VESDEC
  • Contact
 
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

•NEWS

  • VESDEC activities
  • Director activities
  • The Headquarter
    • International Projects
    • National Projects
  • Northern Branch
    • International Projects
    • National Projects
  • Careers at VESDEC

•ABOUT US

  • About us
  • Function
  • Objectives
  • Duties
  • Cooperation linkages

•TOP NEWS

  • Coloful International 3D Mapping Show to celebrate the 50th Anniversary National Reunification (April, 26/2025) Coloful International 3D Mapping Show to celebrate the 50th Anniversary National Reunification (April, 26/2025)
  • Part One: Cleaning up the Bennghe Canal! Part One: Cleaning up the Bennghe Canal!
  • Special features of Ako Dhong village Special features of Ako Dhong village
  • The majestic and pure beauty of Vo Nhai mountain area The majestic and pure beauty of Vo Nhai mountain area
  • Architectural Heritage Crossroads in Hanoi Architectural Heritage Crossroads in Hanoi
  • Good lesson in impact mitigation Good lesson in impact mitigation

Home » News » The Headquarter » International Projects

Initial Environmental Examination for the Changed Options from Viaduct to Embankment in the Benluc – Longthanh Expressway Project (an ADB Project)

In 2010 a detailed Environmental Impact Assessement (EIA) for the Benluc – Longthanh (Ben Luc – Long Thanh) Expressway Project (an ADB Project) has been executed by VESDEC for Katahira and Engineers International (KEI) – a Japanese consulting firm for this project. 
The EIA reports prepared following the Vietnamese and ADB Safeguard Policies have been approved by Ministry of Natural Resources and Environment (MONRE) of Vietnam and ADB. However, to reduce the project cost, Ministry of Transport (MOT) required to change 2 sections at the project alignment from viaduct to embankment. Therefore, ADB asked to prepare an IEE for this change. VESDEC’ environmental specialists were selected by ADB abd VEC to conduct this IEE.
In a duration from January to March 2014 VESDEC led by Dr. Le Trinh, international environmentalist, has conducted field survey, environmental analysis, studied impact assessment, proposed mitigation measures, environmental management plan (EMP) and carried out public consultation. The IEE report (in English) with 300 pages was submitted to the Client and ADB. 

Air sampling and noise measurement (left) and soil layer sampling (right) at the project sections, February 2014

Author: VESDEC

Source: -

Total notes of this article: 5 in 1 rating
Click on stars to rate this article

Newer articles

  • Initial Environmental Asessment (IEE) for the Changed Options of Benluc - Longthanh Expressway Project (08/06/2014)
  • Environnetal Audit for the WB Project: Rural Finance Project III (21/01/2014)
  • Additional study for EIA the Initial Study for Longthanh International Airport (21/01/2014)
 

•MAIN OFFICE

Main Office
Name: No. 179, Bachdang Str., Ward 2, Tanbinh Dist., Ho Chi Minh City, Vietnam
Phone

•LAW ON ENV. PROTECTION

ENV

•STATISTICS

OnlineOnline : 10

TodayToday : 552

This monthThis month : 14217

TotalTotal : 2070368

View counter statistics
   Power by  © Copyright 2010.  All rights reserved Contact us