• Home
  • About us
    • » About us
    • » Function
    • » Objectives
    • » Duties
    • » Cooperation linkages
    • » Organization
  • Topic & Projects
    • » Provision of environmentalist
    • » Scientific research
    • » Environmental monitoring
    • » Study and Preparation of Guidelines in Environmental Protection
    • » Strategic environment assessment
    • » Environmental Impact Assessment
  • Documents
    • » Laws
    • » Decrees
    • » Circulars
    • » Decisions
    • » Regulations
  • Training & Cooperation
    • » International cooperation
    • » Training
  • Scientific reports
    • » Science-Technology
    • » Scientific reports
    • » Scientific workshop
  • News
    • » VESDEC activities
    • » Director activities
    • » The Headquarter
    • » Northern Branch
    • » Careers at VESDEC
  • Contact
 
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

❄

•NEWS

  • VESDEC activities
  • Director activities
  • The Headquarter
    • International Projects
    • National Projects
  • Northern Branch
    • International Projects
    • National Projects
  • Careers at VESDEC

•ABOUT US

  • About us
  • Function
  • Objectives
  • Duties
  • Cooperation linkages
  • Organization
    • Management Board
    • Operation machanism
    • Organizational...

•TOP NEWS

  • Summary of Results of Activities in Environmental Science and Technology in 2022 of The Institute of Environmental Science and Development (VESDEC) Summary of Results of Activities in Environmental Science and Technology in 2022 of The Institute of Environmental Science and Development (VESDEC)
  • The potential impacts of climate change, sea level rise on the Mekong Delta region in the period to 2050 and the response measures The potential impacts of climate change, sea level rise on the Mekong Delta region in the period to 2050 and the response measures
  • Updated documents on natural environment of The Mekong River Delta in Vietnam Updated documents on natural environment of The Mekong River Delta in Vietnam
  • The natural environment of The Mekong Delta The natural environment of The Mekong Delta
  • Summary of the natural environmental key issues in the Mekong River Delta basing on the upadated documents summary of the natural environmental key issues in the Mekong River Delta basing on the upadated documents Summary of the natural environmental key issues in the Mekong River Delta basing on the upadated documents summary of the natural environmental key issues in the Mekong River Delta basing on the upadated documents
  • Summary on  results of strategic environmental assessment (SEA) for the Mekong delta integrated regional plan for the 2021 - 2030 period, with a vision to 2050 Summary on results of strategic environmental assessment (SEA) for the Mekong delta integrated regional plan for the 2021 - 2030 period, with a vision to 2050

Home » News » The Headquarter » International Projects

Initial Environmental Examination for the Changed Options from Viaduct to Embankment in the Benluc – Longthanh Expressway Project (an ADB Project)

In 2010 a detailed Environmental Impact Assessement (EIA) for the Benluc – Longthanh (Ben Luc – Long Thanh) Expressway Project (an ADB Project) has been executed by VESDEC for Katahira and Engineers International (KEI) – a Japanese consulting firm for this project. 
The EIA reports prepared following the Vietnamese and ADB Safeguard Policies have been approved by Ministry of Natural Resources and Environment (MONRE) of Vietnam and ADB. However, to reduce the project cost, Ministry of Transport (MOT) required to change 2 sections at the project alignment from viaduct to embankment. Therefore, ADB asked to prepare an IEE for this change. VESDEC’ environmental specialists were selected by ADB abd VEC to conduct this IEE.
In a duration from January to March 2014 VESDEC led by Dr. Le Trinh, international environmentalist, has conducted field survey, environmental analysis, studied impact assessment, proposed mitigation measures, environmental management plan (EMP) and carried out public consultation. The IEE report (in English) with 300 pages was submitted to the Client and ADB. 

Air sampling and noise measurement (left) and soil layer sampling (right) at the project sections, February 2014

Author: VESDEC

Source: -

Total notes of this article: 5 in 1 rating
Click on stars to rate this article

Newer articles

  • Initial Environmental Asessment (IEE) for the Changed Options of Benluc - Longthanh Expressway Project (08/06/2014)
  • Environnetal Audit for the WB Project: Rural Finance Project III (21/01/2014)
  • Additional study for EIA the Initial Study for Longthanh International Airport (21/01/2014)
 

•CONTACT US

DIRECTOR
Name: Assoc. Prof. Dr. Le Trinh
Phone: 0982619336

HOCHIMINH CITY
Name: No.179 Bachdang St., Ward 2, Tanbinh Dist.
Phone: 028.38489284 (Ext: 4)

HANOI
Name: B19, Lot 9, Dinhcong New Urban Quarter, Hoangmai Dist.
Phone: 0982619336

DANANG CITY
Name: No.92 Thanhhai St., Haichau Dist.
Phone: 0511. 382 4547

•RHINO PROTECTION

ENV

•STATISTICS

OnlineOnline : 12

TodayToday : 342

This monthThis month : 600

TotalTotal : 1751354

View counter statistics
   Power by  © Copyright 2010.  All rights reserved Contact us