• Home
  • About us
    • » About us
    • » Function
    • » Objectives
    • » Duties
    • » Cooperation linkages
  • Topic & Projects
    • » Provision of environmentalist
    • » Scientific research
    • » Environmental monitoring
    • » Study and Preparation of Guidelines in Environmental Protection
    • » Strategic environment assessment
    • » Environmental Impact Assessment
  • Documents
    • » Laws
    • » Decrees
    • » Circulars
    • » Decisions
    • » Regulations
  • Training & Cooperation
    • » International cooperation
    • » Training
  • Scientific reports
    • » Science-Technology
    • » Scientific reports
    • » Scientific workshop
  • News
    • » VESDEC activities
    • » Director activities
    • » Careers at VESDEC
  • Contact
 

•NEWS

  • VESDEC activities
  • Director activities
  • The Headquarter
    • International Projects
    • National Projects
  • Northern Branch
    • International Projects
    • National Projects
  • Careers at VESDEC

•ABOUT US

  • About us
  • Function
  • Objectives
  • Duties
  • Cooperation linkages

•TOP NEWS

  • The Unique Landscapes of the Southern Vietnam on the Two River Basins and Beauty of Some Vietnamese Islands in the Gulf of Thailand The Unique Landscapes of the Southern Vietnam on the Two River Basins and Beauty of Some Vietnamese Islands in the Gulf of Thailand
  • Vietnam: Nature, People, and Life in Diverse Regions and Identity - Volume 1 Vietnam: Nature, People, and Life in Diverse Regions and Identity - Volume 1
  • Green rivers and Can Gio mangrove ecosystem: The lifeblood of Ho Chi Minh City Green rivers and Can Gio mangrove ecosystem: The lifeblood of Ho Chi Minh City
  • Three beautiful waterfalls in the North Central Highland Three beautiful waterfalls in the North Central Highland
  • Natural Beauty of Vietnam (Episode 3) - Southern Vietnam Natural Beauty of Vietnam (Episode 3) - Southern Vietnam

Home » News » Northern Branch

Environmental supervision for Trungson Hydropower Project

From 2012 VESDEC has provided for AECOM New Zealand a National Environmental Supervision Team, included 3 specialists, to implement regularly environmental supervision for the WB Project of Constructionof Trungson Hydropower Plant” on the Ma river, Thanhhoa Province. Daily air, noise, water pollution, soil erosion, sanitation, safety at the construction and worker camp sites are supervised. 
This activity helps the Project Owner and the Contractors in environmental management complying with the WB Safeguard Policies. This assignment has been started from 2012 and will be completed in 2016.

 


Author: VESDEC

Source: -

Total notes of this article: 5 in 1 rating
Click on stars to rate this article

Older articles

  • Environmental Monitoring for National Hygiene Institute (21/01/2014)
  • EIA for Vinh Airport (21/01/2014)
  • Environmental Monitoring for the JICA’ T2 Terminal Constrcution Project at Noibai (Hanoi) International Airport (21/01/2014)
  • Participation into the Environmental Auditing for the End – Term of the WB’ RFP III (21/01/2014)
  • Environmental Supervision for the Trungson Hydropower Project in the Construction Stage (21/01/2014)
 

•MAIN OFFICE

Main Office
Name: No. 179, Bachdang Str., Tansonhoa ward, HCMC, Vietnam
Phone

•LAW ON ENV. PROTECTION

ENV

•STATISTICS

OnlineOnline : 16

TodayToday : 102

This monthThis month : 7331

TotalTotal : 2227880

View counter statistics
   Power by  © Copyright 2010.  All rights reserved Contact us