EIA for Large-Sized Energy Development Projects

24. EIA for the Phalai N2 Coal Fired Thermal Power Plant 600MW Project in Haihung Province, 1995 (Client: EPDC-International, Japan).
25. EIA for the Tranoc Power Plant (40MW) in Cantho, 1995 (Client: PECC2-EVN).
26. EIA for the Phumy N1 Thermal Power Plant (900MW) Project in Baria-Vungtau, 1995, (Client: PECC2- EVN).
27. EIA for the Phumy Energy Complex (3,850MW) Project in Baria - Vungtau, 1996 and 2001(Client: PECC2-EVN).
28. EIA for the Phumy N2 Thermal Power Plant (600MW) Project in Baria-Vungtau, 1996. (Client: PECC2-EVN).
29. EIA for the Quangninh Coal Fired Thermal Power Plant, 330MW, 1996 - 1997 (Client: Oxbow-Raytheon, USA).
30. EIA for the Omon Thermal Power Plant (600-900MW), 1997 (Client: PECC2-EVN).
31. EIA for the Energy Development in Vietnam, 1997 (Client: WB).
32. EIA  for the Waste - into - Energy Project in Hanoi, 1998 (Client: Marubeni, Japan).
33. EIA for the Phumy N2.2 Thermal Power Plant (600MW) Project, 2000-2001 (Client: EDF-TEPCO, EDFI: France-Japan).
34. EIA for the Phumy N4 Thermal Power Plant (450MW) Project, 2000-2001 (Client: EVN).
35. EIA for the Rural Electrification in Southern Provinces, 2003-2004 (WB Project - Client: EVN-WB).
36. EIA for the Rural Electrification for Hatinh Province (WB Project, 2004, Client: EVN).
37. EIA for the 500 KV Transmission Lines from Socson to Quangninh (WB Project), 2005 (Client: EVN-WB).
38. EIA for the 500 KV Transmission Lines from Nhabe, Phulam – Ho Chi Minh City to Omon - Cantho (WB project), 2005 (Client: WB).
39. Study on biodiversity in EIA for Song Bung Hydropower Plant, 2004 (Client: PECC3-EVN).
40. EIA for Dam Bri Hydropower Plant, 2004 (Client: PECC3-EVN).
41. EIA for the Omon III Thermal Power Plant 670 MW, 2006, (Client: EVN).
42. Team Leader of the National Consulting Team in EIA for the Mongduong Coal Fired Thermal Power Center of 2,200 MW in Quangninh Province (ADB TA 4670-VIE), 2006, (Client: Indochina Environmental Consultant - ADB).
43. EIA for the Binhthuan Coal Fired Thermal Power Complex of 4,000 MW, 2007 (Client EVN ).
44. EIA for the Vinhtan 1 Coal Fired Thermal Power Plant of 1,000 MW, 2008 (Client : CSG, China).
45. EIA for the Kiengiang Coal Fired Thermal Power Complex of Tantao Group, 4,400 MW, 2008 (Client PECC-2 )
46. EIA for the Duyenhai 2 Coal Fired Thermal Power Plant of 1,200 MW, 2009 (Client: Janakuasa  SDN BHD, Malaysia).

Author: Vesdec